South Pump Station/External Channel Discharge Structure Repairs

Sienna South Pump Station Discharge Channel Repair

During Hurricane Harvey, the Brazos River inundated the SPLID South Pump Station Discharge Channel for over a week causing extensive damage. The damage was caused by rapid drawdown of the Brazos River.

Project Cost = $2,354,917.30