Pump Station #4 – Phase 1

This will be the second pump station constructed in the southern levee system. Located on Channel 3 on the western edge of the south levee system, this pump station will add an additional 270,000 gpm to the southern levee pumping capacity, thus increasing total pumping capacity in the southern levee system to 530,000 gpm.