Main Channel Widening

The main channel located along the southernmost levee boundary was widened in 2019 from a 10’ bottom width to a 50-70’ bottom width for a distance of 8600’ (1.6 miles) from the south pump station to the southwest corner of Sienna Point. This increased drainage and storage capacity of the Main Channel from 173 to 357 ac-ft, which is a capacity increase of 108%.