Internal Back-Up Sluice Gates at South Pump Station

This project consists of a concrete headwall and eight 8’ x 8’ sluice gates currently being constructed at the south pump station outfall structure located in the southwestern corner of the southern levee system. These gates will provide an emergency back-up system to the proposed exterior flap gates on this structure.