GCWA Sluice Gates at Sienna Parkway Structure

This project consists of adding three 8’ x 8’ sluice gates to the GCWA levee structure located 900’ west of Sienna Parkway and McKeever Road. These gates will provide the first line of defense during a Brazos River high water event and will be backed up by a three 8’ x 8’ existing aluminum stop log system. Delivery of the gates is expected in April 2020. Construction has not begun.