External Flap Gates at North Pump Station

This project consists of adding five 10’ x 10’ flap gates to the exterior face of the north pump station outfall structure located in the southwestern corner of the northern levee system. These flap gates will provide the first line of defense during a Brazos River high water event and will be backed up by the five 10’ x 10’ sluice gate project that was just completed as the emergency back-up system on this structure.