Channel 4 – Phase 4 (Widening)

Channel 4, located in the south-central portion of the southern levee system, is currently being widened from a 10’ bottom width to a 55’ bottom width with a lake storage system a distance of 2500’ (0.5 mile) from Sienna Parkway to Heritage Park. Also included in this project is a dry drainage channel improvement from Heritage Park Drive to the Main Channel. The dry channel is being widened from a 10’ bottom width to a 55’ bottom width a distance of 2600’ (0.5 mile). Construction has not begun.