Channel 2 Widening

Channel 2, located in the south-central portion of the southern levee system, was widened in 2018 from a 10’ bottom width to a 55-70’ bottom width a distance of 5300’ (1.0 mile) from Sienna Parkway to the Main Channel. This increased the drainage and storage capacity of Channel 2 from 34 to 145 ac-ft., which is a capacity increase of 330%.